Work was finished two days before trip when we loaded modules.
We took everything apart and paired modules. For each pair we cut pine board to be used for “crating” pair of modules. Modules are put together with upper sides of two modules facing each other. That way, modules are protected and it is easier to stack them or put additional stuff onto them.
It was a challenge to load all those modules in two cars and after some combinations we succeeded. We had to load legs, rolling stock, tools and materials needed and also leave room for our luggage.



