Davor is getting better (faster) at ballasting as he finished another module while Oli and Boki continued with their work. Ballasting was done on another straight module (narrow one). Oli started terrain on last corner module. This one will have large fill over ravine with a concrete culvert through it.
Mine corner module got its ground foam cover primarely with woodland scenic yellow grass (T43). There are some hint of burnt grass (T44) and larger patches of earth blend (T50). Some coarse turf will be used for small bushes.
Areas of ground will be covered with light brown fine ballast serving as dry earth.
Method used was traditional with covering plaster with slightly diluted white glue then sprinkling it with ground cover. After that, everything is saturated with alcohol and the with diluted white glue.







