This month was all about plastering and painting.
Plastering
We discussed (rough) position of buildings and started plastering the modules.
All the tracks were covered with painters tape to protect them from plaster. Plastering was done with combination of thick and thin mixture of plaster depending on the shape.
After plastering, everything was dusted with thin layer of plaster dust and sprayed with water to fix it. This gives some rougher texture and cover un-natural formations.
All the tracks were covered with painters tape to protect them from plaster. Plastering was done with combination of thick and thin mixture of plaster depending on the shape.
After plastering, everything was dusted with thin layer of plaster dust and sprayed with water to fix it. This gives some rougher texture and cover un-natural formations.
Davor started painting all the plastered modules with light brown (ochre) color. It serve as base for later ground cover work by hiding all the white color of plaster.
During that time work continues on electrical part of loop modules.